Site Observation Report Draft
Turns field notes from a visual walk-through into a structured observation report: exact observation table, limitations, hedged recommendations, DRAFT for the engineer of record.
Free
Site Observation Report Draft
Example session with this skill installed
Draft the site observation report from my notes.
Visit: Example Elementary School gymnasium (fictional), Oct 16, 2026. Visual walk-through from the floor and the roof, 90 minutes, no testing, no measurements beyond tape where noted.
- Roof at bay 3: ponding approx. 10 ft x 6 ft after rain; membrane blistering. Photo 11.
- Steel joist J-14 bottom chord: visible sag, judged by eye only, not measured. Photo 12.
- North masonry wall: stair-step crack approx. 7 ft long, up to 1/8 in wide (tape). Photo 13.
- Roof drain RD-2: strainer missing, debris in the bowl. Photo 14.
- Ceiling tiles stained below bay 3, approx. 4 tiles. Photo 15.
The principal asked: "Can we keep using the gym for the basketball tournament next week?"
- Read your context and instructions
- Compiled the site observation report
DRAFT banner
DRAFT — NOT FOR ISSUE. For review and seal/signature by the engineer of record.
Purpose and scope
Project: Example Elementary School gymnasium (fictional) | Location: [NOT PROVIDED]
Visit date: Oct 16, 2026 | Attendees: field engineer (author of notes); other attendees' roles [NOT PROVIDED] | Purpose: [NOT PROVIDED]
Scope: visual-observation draft; testing and destructive-investigation interpretation excluded.
Limitations
- Visual-only visit status: Visual walk-through from the floor and the roof; no measurements beyond tape where noted.
- Visit duration: 90 minutes
- Areas visited: gymnasium, from the floor and the roof
- Areas not visited/inaccessible: [NOT PROVIDED]
- Testing: no testing (as stated in notes)
- Destructive investigation: [NOT PROVIDED]
- Item 2 (joist sag) was judged by eye only and was not measured. Item 3 dimensions were taken by tape. No other measurements are reported.
- Concealed and unvisited conditions are outside this report's scope.
Observations
| No. | location/grid | observation | approx. size | photo No. |
|---|---|---|---|---|
| 1 | Roof at bay 3 | ponding approx. 10 ft x 6 ft after rain; membrane blistering | approx. 10 ft x 6 ft | Photo 11 |
| 2 | Steel joist J-14 bottom chord | visible sag, judged by eye only, not measured | [NOT PROVIDED] | Photo 12 |
| 3 | North masonry wall | stair-step crack approx. 7 ft long, up to 1/8 in wide (tape) | approx. 7 ft long, up to 1/8 in wide (tape) | Photo 13 |
| 4 | Roof drain RD-2 | strainer missing, debris in the bowl | [NOT PROVIDED] | Photo 14 |
| 5 | below bay 3 | Ceiling tiles stained below bay 3, approx. 4 tiles | approx. 4 tiles | Photo 15 |
Note: For Items 1, 3, and 5, the full source text is kept unchanged in the observation cell. The size values were also copied into the size column. See the items for the engineer of record below.
Discussion
- Items 1 and 5 are both reported at bay 3: roof ponding and membrane blistering above, and stained ceiling tiles below. The co-location is consistent with water reaching the interior near bay 3. The notes do not establish a leak path, how long it has been active, or whether the staining is current.
- Item 4 records a missing strainer and debris in the bowl at RD-2. The notes do not say where RD-2 is relative to bay 3. They also do not establish whether RD-2's condition relates to the ponding in Item 1. No connection is adopted here.
- Item 2 records a visible sag in the J-14 bottom chord. It was judged by eye only. Without a measurement or a reference line, the observation does not support conclusions about magnitude, cause, or capacity. The notes do not say whether J-14 is in or near bay 3. If it is, the engineer of record may wish to evaluate Items 1 and 2 together.
- Item 3 records a stair-step crack in the north masonry wall, with tape dimensions. The notes do not establish cause, age, activity, or significance.
- The principal asked: "Can we keep using the gym for the basketball tournament next week?" Whether this condition is structural or affects safety must be determined by the engineer of record after evaluation. This draft does not answer whether continued use is appropriate.
Recommendations
These are options for the engineer of record to evaluate:
- Evaluate the observed conditions before the planned tournament next week, given the principal's question and timing.
- Measure the J-14 bottom-chord deflection and check adjacent joists, if the engineer of record considers it warranted.
- Locate J-14 and RD-2 relative to bay 3. Assess whether the conditions are related.
- Have the roof membrane, ponding area, and drainage at bay 3 and RD-2 evaluated. This could include reviewing other roof drains not described in the notes.
- Investigate the source of the ceiling-tile staining below bay 3. Check whether moisture is active.
- Evaluate the north wall crack. Consider whether documentation or monitoring is warranted.
- Decide whether any interim precautions are warranted pending evaluation. This draft does not establish any as requirements.
Items for the engineer of record
- Missing inputs, ambiguities, scope conflicts, unsupported assertions:
- Site location, visit purpose, and other attendees' roles: [NOT PROVIDED].
- Destructive investigation status: [NOT PROVIDED].
- Areas not visited or inaccessible: [NOT PROVIDED]. This includes whether the ceiling plenum or joist top chords were accessible.
- Was J-14 viewed from the floor, the roof, or both?
- Item 1: does "approx. 10 ft x 6 ft" apply to the ponding only, or also to the blistering? How long after rain was the ponding observed?
- Item 5: is the location "below bay 3" correct as assigned? Does the size "approx. 4 tiles" describe the stained area?
- Items 1, 3, 5: confirm that copying the size into both the observation and size columns is acceptable.
- Where are J-14 and RD-2 relative to bay 3?
- Scope check: the notes say "no testing" but also report tape measurements. Confirm how tape measurements should be characterized.
- Confirm that each photo number (Photos 11–15) matches the item it is assigned to.
- Client questions:
- The principal asked: "Can we keep using the gym for the basketball tournament next week?" This requires an evaluation by the engineer of record. The draft does not answer it.
- Possible prompt-attention concerns:
- Does Item 2 (J-14 visible sag) require prompt evaluation or interim precautions before the tournament?
- Does Item 1 (ponding and blistering at bay 3) require prompt evaluation or interim precautions, especially if more rain is expected?
- Does Item 4 (RD-2 strainer missing, debris in bowl) require prompt attention to roof drainage?
- Does Item 5 (stained tiles below bay 3) require prompt evaluation for active leaking or tile condition over the playing area?
- Does Item 3 (north wall stair-step crack) require prompt evaluation or interim precautions?
- Verify observations, scope, interpretations, recommendations, and seal/signature requirements before issuance. Sealing and signing rules are set by the applicable licensing board.
Connects securely to your tools. The creator never sees your data.
About this skill
Drafts a site observation report from field notes for review by the engineer of record. It preserves observation entries exactly and separates source notes from tentative discussion. It delivers the complete draft in one reply, with unresolved questions at the end. It does not determine causes, capacities, structural significance, or safety.
Built and tested by AI Professions, where we test AI on real professional tasks. Before this skill was written, we locked a 5-criterion rubric and a fictional test input. Then Claude Opus 5.5, Claude Sonnet 5, Claude Fable 5.1 each ran it 3 times, and a model from another family (GPT-6 Astra) graded every run.
Test results (English, current version v1.1): Claude Opus 5.5: 4.0 of 5 · Claude Sonnet 5: 4.0 of 5 · Claude Fable 5.1: 4.33 of 5. Full transcripts and verdicts are public: prompt-benchmark on GitHub.
What you give it
- Project identifier and general site location, de-identified before submission.
- Visit date, duration, attendees' roles, and purpose.
- Areas visited, areas not visited, and access restrictions.
- Separate observations with No., location/grid, observation, approx. size, and photo No.
- Whether the visit was visual only and whether testing or destructive investigation occurred.
- Client questions, including questions about safety or structural significance.
- Reported concerns that may warrant prompt attention.
For missing or ambiguous information, proceed with "[NOT PROVIDED]" and collect questions in the final section. Do not guess site facts, observation values, visit methods, or results.
Also available
- Spanish, French (France) and Brazilian Portuguese versions adapted to local practice, not translated: skill page · GitHub
- Claude Code plugin:
/plugin marketplace add aiprofessions/claude-skills
Important
The skill produces drafts. A licensed or responsible professional checks every output before use. Do not paste client, patient or personal data into tools your organization has not approved.
Free under CC BY 4.0. Credit: AI Professions (aiprofessions.ai).
Cannot determine safety or structural significance. Requires licensed engineer review. No support for signing or sealing. Does not automate photo uploads.
How to use
- 1
Connect your agent to the Agensi MCP
Copy the prompt and paste it into Claude, ChatGPT, Cursor or any agent that supports MCP. It sets up the connection for you. Manual setup
- 2
Sign in to Agensi
Your agent shows a sign-in link. Sign in and click Allow.
- 3
Ask for what you need
Your agent loads this skill and uses it on your task. It always asks before any payment.
Reviews
No reviews yet
Be one of the first to try it. Every listed skill goes through the trust checks below.
Security scanned
Checked by our 8-point scan before listing
1 use
Times used to date
Free forever
No account required to browse
Trust & safety
Security scan
Security scan passed 25 days ago
- Free with an Agensi account
Permissions
No special permissions declared or detected