primavera p6
Analyze P6 XER files and live EPPM projects for health checks, slip analysis, and driving path reporting.
Free
Works with the AI Agents you already use
primavera p6
Example session with this skill installed
Run a DCMA 14-point health check on the schedule file 'office-update.xer' and tell me if it passes the logic and constraint checks.
- Read your context and instructions
- Compiled the primavera p6
I have analyzed 'office-update.xer' using the DCMA 14-point schedule health check. The analysis identified several logic gaps and a hard constraint that are impacting the schedule's reliability.
Schedule Health Audit: office-update.xer
| Check | Value | Threshold | Result |
|---|---|---|---|
| Logic (Missing Predecessors/Successors) | 12% | < 5% | FAIL |
| Leads (Negative Lag) | 2 | 0 | FAIL |
| Lags (Positive Lag) | 5 | < 5% | PASS |
| Relationship Types (FS Only) | 88% | > 90% | FAIL |
| Hard Constraints | 1 | 0 | FAIL |
| High Float (> 44 Days) | 8% | < 5% | FAIL |
| Negative Float | 3 | 0 | FAIL |
| High Duration (> 44 Days) | 4 | < 5% | PASS |
| Invalid Dates | 0 | 0 | PASS |
Analysis Notes
Logic: 4 activities are missing successors, creating "open ends" in the network. Specifically, check ACT-1020 and ACT-1090.
Hard Constraints: Activity ACT-1150 (Client Review) has a 'Mandatory Finish' constraint which is causing 15 days of negative float.
- Leads: Two relationships have negative lag, which obscures the true critical path.
Next steps
- Remove the 'Mandatory Finish' constraint on
ACT-1150and replace it with a 'Finish On or Before' constraint. - Add successor logic to the 4 activities identified in the
xer_schedule_healthdetailed output to close the network. - Investigate the 2 instances of negative lag and convert them to Finish-to-Start relationships with positive lag if necessary.
Connects securely to your tools. The creator never sees your data.
About this skill
Managing complex Oracle Primavera P6 schedules often requires expensive licenses just to perform basic health checks or status updates. This skill allows developers and project controls professionals to analyze XER files or interact with live P6 EPPM instances directly through a simple command-line interface. It eliminates the manual overhead of exporting data to Excel for DCMA 14-point checks or slip analysis.
What it does
- XER Analysis parses Oracle Primavera P6 export files to extract project summaries, activity lists, and WBS structures without needing a P6 installation.
- Health Auditing executes the DCMA 14-point schedule health check to identify logic gaps, hard constraints, and excessive float.
- Variance Tracking compares two versions of a schedule to report finish slips, logic changes, and duration modifications.
- Path Analysis identifies the driving path and critical path to explain what is currently controlling the project finish date.
- Live Integration connects to P6 EPPM via REST API to read or update activities, relationships, and progress in real-time.
How it works
- Load Data by providing a local
.xerfile path or configuring P6 REST API credentials for live project access. - Execute Analysis using specific tools like
xer_schedule_healthfor audits orxer_comparefor slip reports. - Review Results in the standardized JSON output which includes durations in working days for XER files or hours for live API calls.
- Update Project by submitting JSON payloads to modify activity dates or logic, followed by a remote schedule (F9) command.
Frameworks & tools
The skill is built as a Node.js utility using p6.mjs. It requires Node.js 18 or later and utilizes the P6 REST API for live environment interactions.
Why this beats prompting it yourself
Prompting an LLM to "analyze a P6 file" usually results in hallucinations because the XER format is a proprietary tab-delimited structure with complex relational logic. This skill uses a purpose-built parser to ensure floats, lags, and driving paths are calculated based on actual P6 table relationships rather than pattern matching.
Use cases
- Audit a subcontractor's XER file for DCMA 14-point compliance before importing it into a master schedule.
- Generate a 14-day look-ahead report grouped by WBS for a weekly site meeting.
- Quantify the exact finish date slip between two monthly updates and identify the specific activities responsible.
- Batch update activity progress or status in a live P6 database without opening the P6 client.
Known limitations
XER analysis uses approximations for holidays as they are not stored in the export file. Results should be verified in P6 for exact critical path calculations. live writes require specific environment variable permissions.
XER files lack holiday data, causing minor float discrepancies. Live writes require P6_ALLOW_WRITES=1. API durations use hours while XER uses days. Path analysis is an approximation.
How to use
- 1
Connect your agent to the Agensi MCP
Copy the prompt and paste it into Claude, ChatGPT, Cursor or any agent that supports MCP. It sets up the connection for you. Manual setup
- 2
Sign in to Agensi
Your agent shows a sign-in link. Sign in and click Allow.
- 3
Ask for what you need
Your agent loads this skill and uses it on your task. It always asks before any payment.
Reviews
No reviews yet
Be one of the first to try it. Every listed skill goes through the trust checks below.
Security scanned
Checked by our 8-point scan before listing
Fresh listing
Recently published to Agensi
Free forever
No account required to browse
Trust & safety
Security scan
Security scan passed 16 days ago
- Free with an Agensi account
Requires