Works with the AI Agents you already use
OpenDSS Grid Connection Screening for LV/MV/HV
Automated grid connection screening for data centres and renewables using OpenDSS and MCP-based AC power flow solvers.
$99
OpenDSS Grid Connection Screening for LV/MV/HV
Example session with this skill installed
Screen a 15 MW hyperscale data centre connection at the CIGRE_MV_Rudolstadt 20kV bus. Check for VDE-AR-N 4110 compliance.
- Read your context and instructions
- Compiled the opendss grid connection
The screening for the 15 MW data centre at the CIGRE_MV_Rudolstadt (20 kV) bus is complete. The Tier-2 AC power flow study converged successfully. # Grid Connection Screening Assessment ### 1. Executive Summary - **Application ID:** APP-88231094 - **Asset Type:** Hyperscale Data Centre - **Target Network:** CIGRE_MV_Rudolstadt (20 kV) - **Requested Capacity:** 15.0 MW - **Final Clearance Verdict:** `FAST_TRACK_APPROVED` - **Supervisory Gate:** Human Review Required: `False` | Regulatory Override: `None` ### 2. Electrical & Constraint Metrics | Parameter | Measured Value | Standard / Limit | Compliance Status | | :--- | :--- | :--- | :--- | | **Peak Steady-State Voltage** | `1.0245 p.u.` | $\le 1.100\text{ p.u.}$ (VDE-AR-N 4110) | `PASS` | | **Max Conductor / TX Loading** | `78.2 %` | $\le 100.0\%$ rated thermal ampacity | `PASS` | | **Post-Contingency SCR (N-1)** | `12.40` | $\ge 2.00$ (NER S5.2.5 / VDE) | `PASS` | | **PCC Fault Level ($S_{sc}$)** | `245.0 MVA` | Baseline short-circuit stiffness | `INFORMATIONAL` | | **Governing Constraint** | `NONE` | Primary limiting physical driver | `RECORDED` | ### 3. Mitigation & Operating Envelope - **Approved Firm Capacity:** 15.0 MW - **Export / Import Constraint:** None (Continuous Load) - **Required Remediations:** Standard Power Factor correction at PCC. ### 4. Cryptographic Audit Receipt (Zero-Trust Ledger) - **Feeder Model SHA-256:** `a1f8e...392b` - **Reproducibility SHA-256:** `92d1c...88ef` - **Queue Fingerprint:** `q_rudolstadt_15mw_001` - **Solver Failure Count:** 0 **Next steps** - Download the full voltage trajectory plot at `grid://verdicts/q_rudolstadt_15mw_001/plot.svg`. - Proceed to formal grid connection application with the Audit Receipt. - Perform harmonic emission study if VFD density exceeds 20% of total load.
Connects securely to your tools. The creator never sees your data.
About this skill
Grid operators and industrial developers face weeks of manual engineering for every new connection request. This skill automates the preliminary screening of hyperscale data centers, BESS, and renewable assets using deterministic 3-phase OpenDSS AC power flow. It replaces guesswork with physics-based solvers to determine if a project will trip thermal limits or violate grid codes before you commit to expensive formal studies. ## What it does - **Deterministic Power Flow Analysis** executes unbalanced 3-phase AC power flow and N-1 contingency simulations via OpenDSS. - **Compliance Enforcement** validates designs against VDE-AR-N 4110, NER S5.2.5 (SCR >= 2.0), and AS/NZS 4777.2 standards. - **Constraint Identification** identifies binding physical drivers including steady-state over-voltage, thermal ampacity, or weak-grid system strength. - **Capacity Sweeping** performs multi-point capacity sweeps to find the exact hosting capacity inflection threshold for a given feeder. - **Mitigation Synthesis** generates operating envelopes and remediation strategies like synchronous condenser sizing or BESS peak-shaving. ## How it works 1. **Intake Normalization** processes connection capacity, asset type, and target network voltage levels from LV (415V) to EHV (500kV). 2. **Electrical Inspection** calls `inspect_connection_point` to calculate Thevenin impedance, fault levels, and dV/dP sensitivity. 3. **Progressive Screening** runs Tier-1 fast-clearing or escalates to Tier-2 AC studies for complex snapshots and time-series analysis. 4. **Audit Generation** produces a signed report with SHA-256 receipts for model and solver reproducibility. ## Frameworks & tools This skill requires the `grid-screen-mcp` server. It utilizes OpenDSS for the underlying physics engine, Python for batch solvers, and supports Model Context Protocol (MCP) compatible hosts like Cursor or Claude Desktop. ## Why this beats prompting it yourself LLMs cannot simulate electrical physics or calculate short-circuit ratios reliably. This skill forces the agent to use deterministic tools, preventing "hallucinated compliance" and ensuring every verdict is backed by an actual AC power flow convergence. ## Use cases - Screening 25MW hyperscale data centers for thermal loading and voltage drop. - Evaluating BESS system strength (SCR) on weak 132kV transmission fringes. - Calculating hosting capacity for residential solar feeders using AS/NZS 4777.2 droop modes. - Automating VDE-AR-N 4110 compliance checks for European MV industrial loads. ## Known limitations Requires a running `grid-screen-mcp` server. Large-scale EMT/PSCAD dynamic simulations are out of scope and require escalation to human engineers for SCR < 2.0.
Requires grid-screen-mcp server. SCR < 2.0 triggers mandatory human review. Limited to supported network models in the catalog. Does not perform full EMT/PSCAD dynamic simulation.
How to use
- 1
Connect your agent to the Agensi MCP
Copy the prompt and paste it into Claude, ChatGPT, Cursor or any agent that supports MCP. It sets up the connection for you. Manual setup
- 2
Sign in to Agensi
Your agent shows a sign-in link. Sign in and click Allow.
- 3
Ask for what you need
Your agent loads this skill and uses it on your task. It always asks before any payment.
Reviews
No reviews yet
Be one of the first to try it. Every listed skill goes through the trust checks below.
Security scanned
Checked by our 8-point scan before listing
Fresh listing
Recently published to Agensi
Money-back guarantee
Doesn't do what its page promises? You get your money back.
Trust & safety
Security scan
Security scan passed 15 days ago
Requires