- Home
- Skills
- Business & Operations
- msproject mcp
msproject mcp
Control Microsoft Project desktop to build schedules, link dependencies, and calculate the critical path via COM.
Free
Works with the AI Agents you already use
msproject mcp
Example session with this skill installed
Create a new project called 'Office Move', set the start date to 2025-06-01, add a 'Planning' summary task, and a 'Hire Movers' subtask with a 3 day duration.
- Read your context and instructions
- Compiled the msproject mcp
I have created the new project and added the initial tasks. The schedule has been calculated and saved to your documents.
Project Construction Results
| Task ID | Task Name | Duration | Parent ID | Type |
|---|---|---|---|---|
| 1 | Office Move | 3 days | - | Project Summary |
| 2 | Planning | 3 days | 1 | Summary Task |
| 3 | Hire Movers | 3 days | 2 | Fixed Duration |
Next steps
- Add Dependencies: Tell me which tasks should follow 'Hire Movers'.
- Assign Resources: Provide names of staff or vendors to assign to these tasks.
- Define Milestones: Identify key dates like 'Move Complete' to add as 0d tasks.
Connects securely to your tools. The creator never sees your data.
About this skill
Managing project schedules in Microsoft Project through an LLM is typically impossible because the application runs locally and lacks a modern API. This skill bridges that gap by using COM automation to drive the Project desktop client directly from your agent. It enables programmatic creation, editing, and analysis of .mpp files without leaving your terminal or chat interface.
What it does
- Schedule Construction builds full project plans from scratch, including task hierarchies and summary tasks.
- Dependency Management links tasks with Finish-to-Start, SS, FF, or SF relationships and handles lead/lag times.
- Resource Allocation adds resources to the project pool and assigns them to specific tasks with defined units.
- Critical Path Analysis identifies the sequence of dependent tasks that determines the project finish date.
- Baseline Management saves project baselines to track planned versus actual progress over the project lifecycle.
- File Exporting saves projects as native
.mppfiles, XML, or exports the current view to a PDF.
How it works
- Status Check runs the
get_statuscommand to attach to the Project instance and verify the environment is ready. - Context Retrieval uses
list_tasksandget_project_infoto map existing task IDs and project structure. - Execution performs changes using individual commands or a
batchJSON file for complex multi-step updates. - Finalization triggers
calculate_projectto update the schedule engine andsave_projectto commit changes to disk.
Frameworks & tools
The skill requires Windows with Microsoft Project (2016+ Standard or Professional). It uses a Python bridge with pywin32 and uv to communicate with the Project COM interface.
Why this beats prompting it yourself
Writing a schedule manually via an LLM often results in broken logic or invalid CSV imports. This skill interacts with the Project calculation engine in real-time, ensuring that dependencies, calendars, and constraints are respected exactly as if a human were clicking the buttons.
Use cases
- Generate a 50-line construction schedule from a high-level scope document.
- Update progress and percent complete for a list of tasks from a status report.
- Audit an existing
.mppfile to find tasks missing predecessors on the critical path. - Convert a natural language list of resource assignments into a balanced project plan.
Known limitations
Requires Windows and a licensed Project desktop installation; cloud sandboxes are not supported. It does not support custom calendars or working-time exceptions.
Requires Windows and local MS Project install. No cloud sandbox support. Cannot edit custom calendars or holidays. COM automation may hang if Project displays a modal dialog.
How to use
- 1
Connect your agent to the Agensi MCP
Copy the prompt and paste it into Claude, ChatGPT, Cursor or any agent that supports MCP. It sets up the connection for you. Manual setup
- 2
Sign in to Agensi
Your agent shows a sign-in link. Sign in and click Allow.
- 3
Ask for what you need
Your agent loads this skill and uses it on your task. It always asks before any payment.
Reviews
No reviews yet
Be one of the first to try it. Every listed skill goes through the trust checks below.
Security scanned
Checked by our 8-point scan before listing
Fresh listing
Recently published to Agensi
Free forever
No account required to browse
Trust & safety
Security scan
Security scan passed 18 days ago
- Free with an Agensi account
Requires