Construction Tender Review

    1

    Turns RFQ and tender documents into a scope matrix, risk list and clarification questions before you price.

    $12

    Secure checkout via Stripe

    Money-back guarantee

    Converts to your local currency at checkout

    Security scanned

    Works with the AI Agents you already use

    Claude CodeClaude CodeCursorCursorCodex CLICodex CLIMuseMuseDotsDots+21 more

    Construction Tender Review

    Example session with this skill installed

    I'm pricing the electrical package for the Bridge St Offices. Here is the RFQ text and Spec Section 26. Deadline is Friday. What is my scope and what risks should I watch out for?

    • Read your context and instructions
    • Compiled the construction tender review

    I have reviewed the Bridge St Offices RFQ and Spec Section 26. Several appendices mentioned in the RFQ were not provided.

    Documents

    • RFQ Cover Letter (Dated 2023-10-12)
    • Spec Section 26 - Electrical (Rev 2)
    • Missing: Appendix B (Site Logistics), Appendix C (Schedule)

    Scope matrix

    ItemSourceIn ScopeQty GivenNote
    LV SwitchgearSpec 26.2.1YesYesIncludes 2x 800A boards
    Emergency LightingSpec 26.4.5YesNoLayout requested in bid
    Temporary PowerRFQ Pg 3UnclearNoMentions 'by others' but contradicts Spec 26.1

    Exclusions and gaps

    • Explicitly Excluded: Data cabling (Spec 26.8.2 states "By Specialist Contractor").

    Conflicting: RFQ states temporary power is by the main contractor, but Spec 26.1.4 requires the electrical sub to provide site temporary boards.

    Check with Main Contractor: Fire alarm interface, containment for security systems, and site office hook-ups are not mentioned.

    Commercial risks

    • Payment Terms: 45 days from end of month (RFQ Pg 5).
    • Liquidated Damages: £5,000 per week, no stated cap (RFQ Pg 6). Ask a lawyer.
    • Retention: 5% reducing to 2.5% at Practical Completion (RFQ Pg 5).
    • Insurance: £10M Public Liability required (RFQ Pg 6).

    Schedule risks

    Lead Times: Spec 26.2.1 notes 16-week lead time for switchgear; deadline Friday is tight for current supply chain.

    • Access: Requires coordination with Drywall trade for first-fix in Week 4.

    Questions

    1. Clause 26.1.4 vs RFQ Pg 3: Please confirm who is responsible for temporary site power?
    2. Spec 26.4.5: Will a reflected ceiling plan be provided for emergency lighting layouts?
    3. RFQ Pg 6: Is there a maximum cap on Liquidated Damages?

    Recommendation

    Bid with conditions. The scope is clear, but the conflicting temporary power requirement and uncapped LDs represent significant risk. The decision to proceed is yours.

    Next steps

    1. Request Appendix B and C immediately to verify site access and completion dates.
    2. Email the three clarification questions to the lead estimator.
    3. Consult your legal counsel regarding the uncapped liability in the LD clause.

    Connects securely to your tools. The creator never sees your data.

    About this skill

    Tender documents are long, and the costly problems sit in the gaps: a missing appendix, two clauses that disagree, liquidated damages with no cap. This skill reads the documents you paste and gives you a short brief you can price from.

    What you get:

    • A list of the documents received, with missing ones that others refer to
    • A scope matrix for your trade, each row tied to a document and clause
    • Exclusions, silent gaps and conflicting clauses, quoted
    • Commercial risks (payment, retention, liquidated damages, liability, variations) and schedule risks
    • Up to 12 clarification questions, ranked by money at stake and ready to paste into an email
    • A bid, bid with conditions or do not bid view. The decision stays with you.

    How it behaves: every finding cites a clause. If something is not in the documents, it says "not stated" instead of guessing. It does not invent standards, prices or quantities, and it flags legal terms with "ask a lawyer" rather than interpreting them.

    Not included: pricing, quantity take-off from drawings, legal advice.

    The package has the skill and two worked examples that use fictional projects. Skill text and examples were written with the help of an AI model and checked by the maker, Törmän Liikenne Oy.

    Cannot perform quantity take-offs or read images/drawings. Does not provide pricing, legal advice, or regulatory interpretation. User must provide trade context.

    How to use

    1. 1

      Connect your agent to the Agensi MCP

      Copy the prompt and paste it into Claude, ChatGPT, Cursor or any agent that supports MCP. It sets up the connection for you. Manual setup

    2. 2

      Sign in to Agensi

      Your agent shows a sign-in link. Sign in and click Allow.

    3. 3

      Ask for what you need

      Your agent loads this skill and uses it on your task. It always asks before any payment.

    Reviews

    No reviews yet

    Be one of the first to try it. Every listed skill goes through the trust checks below.

    Security scanned

    Checked by our 8-point scan before listing

    Fresh listing

    Recently published to Agensi

    Money-back guarantee

    Doesn't do what its page promises? You get your money back.

    Trust & safety

    Security scan

    Security scan passed 4 days ago

    Permissions

    Read Files
    Listed10 days ago
    Updated4 days ago

    What's inside

    Frequently Asked Questions

    While it cannot perform physical take-offs from architectural drawings, it excels at auditing the written descriptions in your Bill of Quantities, specifications, and scope of works to ensure your estimates match the textual requirements.

    The skill is designed to work with all major text-based LLMs available on this marketplace; simply ensure your agent has access to the tender's PDF or TXT files for the audit to begin.

    Every risk identified—such as liquidated damages or indemnity clauses—is accompanied by a specific page number or clause citation from your documents to prevent hallucinations and provide a clear audit trail.

    The skill is pre-configured to detect discrepancies between trade-specific specifications and general contract conditions, so it works directly out of the box once you input your trade and upload the tender package.

    No, this skill is strictly for data extraction and risk highlighting; all bid recommendations should be reviewed by your legal or commercial team to ensure they align with your firm's specific risk appetite.

    New in Business & Operations