Works with the AI Agents you already use

    Claude CodeClaude CodeCursorCursorCodex CLICodex CLIMuseMuseDotsDots+21 more

    Construction Quote Intelligence — Build & Review Estimates

    1

    Build transparent construction estimates, normalize quotes and expose scope gaps, assumptions and margin risks.

    $9.99

    Secure checkout via Stripe

    Money-back guarantee

    Converts to your local currency at checkout

    Security scanned
    Construction Quote Intelligence — Build & Review Estimates

    Construction Quote Intelligence — Build & Review Estimates

    Example session with this skill installed

    Illustrative estimate: supplied measured area 100 m², material USD 12/m², approved waste allowance 10%, labor 0.4 hours/m² of installed area at USD 30/hour, equipment USD 200, fixed indirect cost USD 300. Apply 15% markup on direct plus indirect cost. Tax is unconfirmed. Show formulas, pre-tax total, markup versus margin, assumptions and review gaps. Do not add unknown fees or claim this is a firm quote.

    • Read your context and instructions
    • Compiled the construction quote intelligence

    Preliminary estimate

    Calculated from supplied quantities, rates and approved waste assumption. Currency: USD. Tax treatment, project location, drawing revision, quote dates and validity are unknown. This is not a firm offer or certified takeoff.

    ComponentFormulaAmount
    Material quantity with waste100 m² × 1.10110 m²
    Material110 m² × USD 12/m²USD 1,320
    Labor100 m² × 0.4 hours/m² × USD 30/hourUSD 1,200
    EquipmentSupplied fixed amountUSD 200
    Direct cost1,320 + 1,200 + 200USD 2,720
    Indirect costSupplied fixed amountUSD 300
    Cost base2,720 + 300USD 3,020
    15% markup3,020 × 0.15USD 453
    Pre-tax estimate3,020 + 453USD 3,473

    Markup and margin

    Markup is 15% of cost. The implied surplus before omitted costs is USD 453; 453 ÷ 3,473 × 100 = approximately 13.04% of price. Markup and margin are not interchangeable. No separate contingency was supplied or added, and the surplus is not guaranteed realized profit.

    Measurement and scope assumptions

    100 m² is user-supplied measured installed area, not independently taken from a drawing. Waste is applied to material only. Labor uses the supplied installed-area basis, producing 40 hours; it is not multiplied by material waste. Equipment and indirects are treated as the supplied fixed amounts. Scope boundaries, exclusions and whether labor includes burdens or supervision must be confirmed.

    Review gaps

    Tax: unknown, not assumed zero. Delivery, handling, storage, consumables, temporary works, testing, permits, escalation, subcontract scope and risk contingency: coverage unconfirmed. Confirm whether these are included in supplied rates before adding or excluding them to prevent double-counting. Verify units, measured area, document revision, rate source/date/region, procurement and quote validity.

    Next actions

    Estimator checks scope and arithmetic; project leadership confirms commercial markup and risk treatment; appropriate tax and technical reviewers confirm requirements. Update the versioned estimate with source references and explicit allowances. No quote was issued, order placed or final price approved.

    Connects securely to your tools. The creator never sees your data.

    About this skill

    Understand what a project estimate really includes

    Construction Quote Intelligence helps contractors, trades, estimators and owners organize scope, measurement basis, quantities and commercial inputs into clear estimates and comparisons.

    It supports document/revision control, work breakdown structures, source-traceable takeoff assistance, unit normalization, labor/material/equipment cost build-ups, subcontract comparison, allowances, contingency, overhead, markup, taxes, alternatives and change-order review. With valid actual-cost inputs it can support variance and estimate calibration.

    Outputs include scope matrices, estimate worksheets, quote-leveling tables, assumptions and exclusions, risk scenarios and bid review checklists. It distinguishes a supplier price from delivered installed cost and preserves uncertainty instead of inventing local rates or site conditions.

    File, image and calculation features depend on host tools. Missing scale or unreadable plans mean quantities stay unverified. Qualified humans approve final estimates, technical matters and commercial decisions; the skill does not guarantee cost or profit.

    Estimates are forecasts and do not guarantee final cost, bid success or profit. Measurements require valid dimensions, scale, units and revisions. Local rates, productivity, taxes, concealed conditions, vendor availability and technical requirements must be supplied or verified. Does not replace qualified design, safety, estimating, legal or tax review. Large takeoffs, automation, exports and history depend on available tools.

    How to use

    1. 1

      Connect your agent to the Agensi MCP

      Copy the prompt and paste it into Claude, ChatGPT, Cursor or any agent that supports MCP. It sets up the connection for you. Manual setup

    2. 2

      Sign in to Agensi

      Your agent shows a sign-in link. Sign in and click Allow.

    3. 3

      Ask for what you need

      Your agent loads this skill and uses it on your task. It always asks before any payment.

    Reviews

    No reviews yet

    Be one of the first to try it. Every listed skill goes through the trust checks below.

    Security scanned

    Checked by our 8-point scan before listing

    Fresh listing

    Recently published to Agensi

    Money-back guarantee

    Doesn't do what its page promises? You get your money back.

    Trust & safety

    Security scan

    Security scan passed 1 month ago

    Permissions

    Read Files
    Write Files

    File Scopes

    Authorized
    task
    inputs
    and
    agreed
    output
    directory
    only

    Read only authorized drawings, BOQs, quote sheets and cost reports; write drafts to agreed locations. Optional browsing, image analysis, code and estimating/ERP/cost-database access depend on tools and least-privilege authorization. Preserve confidential vendor pricing and internal margin. No accounts are needed for supplied-input calculations. Final quote issuance, procurement, monitoring or system writes requires explicit authority and confirmation.

    Listed1 month ago

    What's inside

    Frequently Asked Questions

    Only when file/image tools and reliable dimensions, scale and revision information are available. Unreadable or incomplete plans lead to provisional quantities or requests for better inputs.

    Yes. It shows the cost base, markup calculation and implied margin separately, while preserving contingency, overhead and tax treatment and flagging omitted costs.

    Yes. It normalizes scope, inclusions, exclusions, units and commercial terms using supplied evidence; unknown adjustments remain explicit rather than fabricated.

    New in Finance & Accounting